- Public Safety Facility Electrical Generator – Things to consider before starting your Project
- Local Long Term Power Outage (LTPO) Emergency Plan
Level 1
- Identify which government and private sector entities are the most important to have back up power systems.
- Stockpile a cache of mobile/portable generators that can be used for critical facilities.
Level 2
- Install backup power generators and/or wind/solar powered batteries at the most critical government facilities. Encourge/regulate private sector installation of backup power systems.
- Harden critical generators and power systems in the most critcal government facilities. Encourage/regulate hardening private sector critical facilities/utilities.
Level 3
- Stockpile fuel for critical generators. Dertermine if there are any fuel depots that can be controlled or confiscated to provide long term fuel supply.
- Regulate local electrical utilities to harden power plants, transmission systems, and transformer substations for EMP.